| Jetty, Ramp & Pontoon for 2 Lyons Road, Drummoyne NSW. | Drummoyne NSW | 2010 | Michael Briscas | Structural Analysis, design and documentation | Maritime Design, Inspection & Certification. | ||||||
| Jetty, Ramp & Pontoon for 43 Abbotsford Parade, Abbotsford | Abbotsford. NSW | 2009 | Marine Advisory Services | Structural Analysis, design and documentation | Maritime Design, Inspection & Certification. | ||||||
| Jetty, Access Ramp and Steel Pontoons | Port Hera, East Timor | Ongoing | Government of Timor-Leste - Ministry of Defence & Security |
Maritime Design of Reinforced Concrete Ramp, Pontoon & Stability Piles | Maritime Design, Inspection & Certification. | ||||||
| Cawsey Seawall Repairs | Birchgrove | 2009 | Mrs. K. Cawsey | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Shell Wharf 2 Remedial Works | Gore Bay | 2009 | Shell Engineering Pty Ltd Cliff Bell | Condition Survey & report on repair types and maintenance. | Design, document & Inspection. | ||||||
| Pontoon and Boat Ramp Design | Taplin Park, NSW | 2009 | Clement Marine Services Richard Oppedisano | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Design, Inspection & Certification. | ||||||
| Floating Pontoon Marina System - Tom Ugly's Bridge | Sylvania | 2009 | Tom Ugly's Bridge Marina | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Design, Inspection & Certification. | ||||||
| Moorings Marina - Erosion Control to Seawall | Tomaking NSW | 2009 | Mooring Resort Ltd - Bob Weekes | Structural Design of Foundation, and External works including Retaining walls etc. | Technical Advice on Maritime issues. | ||||||
| Shell - Interceptor Redesign | Gore Bay | Ongoing | Shell Engineering Pty Ltd Denis Green | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Pontoon and Access Ramp Design | Archer Park, NSW | 2009 | Clement Marine Services Richard Oppedisano | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Design, Inspection & Certification. | ||||||
| Masters Olympics Pontoon | Parramatta NSW | 2009 | Clement Marine Services Richard Oppedisano | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Sydney 2009 Boat Show | Sydney | 2009 | BIA of NSW - Belinda Close | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Pontoon design at Tunks Park | North Sydney, NSW | 2009 | Clement Marine Services Richard Oppedisano | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Design, Inspection & Certification. | ||||||
| Seawall design | Drummoyne | 2009 | Marist Brothers - Bernard Kenna | Structural Design of Foundation, and External works including Retaining walls etc. | Structural Design | ||||||
| BIA NSW Flagpole Brackets | Crows Nest | 2009 | BIA of NSW Belinda Close | Structural Analysis & Report | Report | ||||||
| Boardwalk & Slipway Design | Cronulla | 2009 | Paul Taylor | Maritime and Structural Design of upgrading of jetty . | Structural Design | ||||||
| Polaris Marine Barges "The Mole" | Fort Denison | 2009 | Polaris Marine - Gavin Mannile | Mooring Analysis & Report. | Maritime Analysis & Report. | ||||||
| Norfolk Island - Demountable Wharf | Norfolk Island | 2009 | Norfolk Island Government Neville Christian | Maritime design, documentation, inspection during construction and certification upon completion | Structural Design, Tender Documentation & Contract Administration. | ||||||
| Revisions to Davit Structure | Sydney NSW | 2009 | Sydney Aquarium - Andrew Barnes | Structural Analysis, design and documentation | Structural Design and Supervision. | ||||||
| Mooring Piles design | Hunters Hill | 2009 | Marine Advisory Services Charles Parsons | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Shear Leg Barge Stability Calculations | Annandale, NSW | 2009 | Clement Marine Services Richard Oppedisano | Stability analysis and documentation. | Maritime Analysis, Design & Report. | ||||||
| Boardwalk Refurbishment at the Sydney Fish Markets | PYRMONT, NSW | 2009 | The Sydney Fish Markets, Mr. Joe Rotondo – Engineering Manager |
Maritime and Structural Design of upgrading of jetty . | Design and documenation. | ||||||
| Corroseal - Wollongong Whaf 6 PPR3 Upgrade | Narrellan NSW | 2009 | Corroseal Coatings Pty Ltd Mr. Allen Lee | Structural Analysis & Report | Design & documentation. | ||||||
| Gore Bay Wharf 1 - Condition Survey | Gore Bay | 2009 | Shell Engineering Pty Ltd Mr. Kourosh Malekou | Conditioin Survey, report and design / document remedial works. | Condition Survey & Report | ||||||
| Proposed Jetty & Mooring of 2 houseboats | Chatsworth Island NSW | 2009 | Horne Contract - Mark Horne 0417-629411 | Mooring Analysis, design and documentation | Design and documenation. | ||||||
| Boat Ramp & Retaining Walls | East Hills | 2009 | B. Franklin | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Gore Bay Interceptor Cofferdams | Gore Bay | 2008-2009 | Shell Refining (Australia) Pty Ltd. | Concept and detailed Design of Maritime Structure, assisting in tender & budget estimates | Maritime Design, Inspection & Certification. | ||||||
| Sydney International Boat Show - 2008 | Sydney | 2008 | Boating Industry Association of NSW Ltd | Layout plan, mooring analysis and certification of mooring facilities. | Maritime Analysis, Design & Report. | ||||||
| Technical Assistance on Marina Development | Sandy Point | 2009 | Nanlego Developments Pty Ltd | Seawall,Marina, Ramp,Walkway & Boat shed | Structural Design | ||||||
| Sydney Fish Market Boardwalk | Pyrmont, Sydney | 2009 | Sydney Fish Market Pty Ltd | Concept & detailed design for RC Boardwalk & promanade | Structural Design | ||||||
| Lake Conjola Deepwater Resort | Lake Conjola | 2008 | Treloar group | Concept Engineering Plan for structure of Marine resort | Structural Design | ||||||
| Construction of a Mooring Pen at 34 Joubert Street Hunters Hill for Mr. P Mills | Hunters Hill | 2008 | Waterlink Pty Ltd | Construction Certificate for Moorng Pile | Inspection & Certifiaction | ||||||
| Replacement of existing fenders and fender frames at Wharf 1 - Gore Bay | Gore Bay | 2009 | Shell Refining (Australia) Pty Ltd. | Design, assisting in tender & in supervision and certification of Structural Steel Fender Frame at North & South Dolphins. | Structural Design | ||||||
| Kurnell Wharf | Kurnell | 2008 | Clement Marine Services Richard Oppedisano | Technical assistance on alternative maritime structural design for Jetty. | Technical assistance | ||||||
| Temporary Mooring arrangement for Tom Ugly's Bridge renovations | Sutherland | 2008 | RTA Rockdale | Mooring Analysis & Report. | Technical Advice on Maritime issues. | ||||||
| Jetty, Pontoon and Ramp at 10 Fortescue Street Chiswick for Mr M Hakim |
Chiswick | 2008 | Waterlink Pty Ltd | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Design, Inspection & Certification. | ||||||
| Sub structure inspection, design analysis and repairs to existing timber jetty. | Sydney | 2008 | Sydney Aquarium | Conditioin Survey, report and design / document remedial works. | Structural Inspection, analysis & Design Check, Condition report and Load rating. | ||||||
| Review and Marina at Marmong Cove | Marmong cove | 2008 | Marmong cove Marine | Mooring Analysis & Report. | Technical Advice on Maritime issues. | ||||||
| Proposed Seawall Modification and new timber steps and landing at 14 Musgrave street, Mosman. | Mosman | 2008 | Clement Marine Services | Structural Analysis, design and documentation | Maritime Design, Inspection & Certification. | ||||||
| Stability Analysis for the new steel barge for 16T. | Annandale | 2008 | Clement Marine Services | Concept Design of Marina & Report. | Maritime Analysis, Design & Report. | ||||||
| Load capacities of Loading Arm at Shell Gore Bay- Wharf2. | Gore Bay | 2008 | Shell Refining (Australia) Pty Ltd. | Mooring Analysis & Report. | Maritime Analysis & Report. | ||||||
| Removal of an Existing Jetty and Construction of a New Jetty Ramp and Pontoon and Piles and the Provision of One Permanent Berth at 2E Mosman Street, Mosman . | Mosman | 2008 | Property Development Corporation Pty Ltd | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Analysis, Design & Report. | ||||||
| Design and Construction of a Public Pontoon at Kangaroo Point Brooklyn | Kangaroo Point | 2008 | Clement Marine Services | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Analysis, Design & Report. | ||||||
| 82 berth floating pontoon marina facility in the Mary River at Maryborough, Fraser Coast. Queensland. | Queensland | 2008 | The Drawing Office Pty Ltd | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Design, Inspection & Certification. | ||||||
| Prestige Marine Pontoon certification | Sydney | 2008 | Prestige Marine | Concept Design of Marina & Report. | Maritime Analysis, Design & Report. | ||||||
| NSW BIA Summer Boat Sale | Sydney | 2008 | Boating Industry Association of NSW Ltd | Layout plan, mooring analysis and certification of mooring facilities. | Maritime Analysis, Design & Report. | ||||||
| Design of Moduar barge | Sydney | 2008 | Corroseal Coatings Pty Ltd | Concept Design of Marina & Report. | Maritime Analysis, Design & Report. | ||||||
| Design of Gunnamatta Pool Starting Blocks | Gunnamatta Bay NSW. | 2008 | Clement Marine Services | Concept Design of Marina & Report. | Maritime Analysis, Design & Report. | ||||||
| BIA Victorian Summer Boat Show | Melbourne | 2008 | BIA Victoria | Layout plan, mooring analysis and certification of mooring facilities. | Maritime Analysis, Design & Report. | ||||||
| Construction Of Mooring Pens At 57 Huntleys Point Road, Huntleys Point Nsw 2111 | Huntleys Point | 2007 | Mr & Mrs J Anschau | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Remedial Works on Wharf 2 at Gore Bay Facilities | Gore Bay | 2007 | Shell Refining (Australia) Pty Ltd. | Condition Survey & and Report on Structural Adequacy and Load rating. | Condition Survey, design & documentation. | ||||||
| Greenwell Point Boat Ramp & Pontoon | Greenwell Point | 2007/2008 | Shoalhaven City Council | Maritime Design of Reinforced Concrete Ramp, Pontoon & Stability Piles | Maritime Analysis, Design & Report. | ||||||
| Work-As-Executed Certificate for Boatshed & slipway at No. 34 Julian Street, Mosman | Mosman | 2007 | Clement Marine Services | Maritime Inspection & Certification | Technical Advice on Maritime issues. | ||||||
| 2007 Sydney International Boat Show - Engineering Certificate | Sydney | 2007 | Boating Industry Association | Layout plan, mooring analysis and certification of mooring facilities. | Maritime Analysis, Design & Report. | ||||||
| Technical advice on improvements to Seawall at 104 Louisa Road- Birchgrove | Birchgrove | 2007/2008 | Mrs K Cawsey | Conditioin Survey, report and design / document remedial works. | Condition Survey & Report | ||||||
| Construction of Jetty, Ramp, Pontoon & Mooring Piles At 62 Louisa Road, Birchgrove |
Birchgrove | 207/2008 | Mrs. Denise Medley | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Analysis, Design & Report. | ||||||
| Repairs to seawall at 28 Julian Street, Mosman. | Mossman | 2008 | Mr. David Hunter | Conditioin Survey, report and design / document remedial works. | Structural Design and Supervision. | ||||||
| Construction of Fisherman's Wharf - The Entrance | The Entrance | 2007/2008 | Clement Marine Services | Structural Analysis, design and documentation | Maritime Analysis, Design & Report. | ||||||
| Technical Presentation at International Marinas Association | Sydney | 2007 | International Marinas Association | Convened Course & presented technical papers | Convened Course | ||||||
| Replacement of Existing Timber Jetty With Gangway and Floating Pontoon and Dredging Work at Prince Edward Park | Woronora | 2008 | Clement Marine Services | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Swallow Rock Reserve - Boat Ramp / Jetty & Pathway Extensions | Grays Point | 2008 | Clement Marine Services | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Replacement of existing timber with Structural Steel Mooring Piles at 7 Toocooya Road, Hunters Hill | Hunters Hill | 2007 | Mr Chris Spencer & Marine Advisory Services | Mooring Analysis, design and documentation | Maritime Analysis, Design & Report. | ||||||
| Fender Piles at 9 Dorset Road, Northbridge | Birchgrove | 2007 | Malibru Pty Ltd | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Proposed marina Development at 30-32 St Georges Crescent Drummoyne | Drummoyne | 2007 | Cape Bouvard Investments | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Maritime Concept Design | ||||||
| Timber Jetty at 81 New Beach Road, Darling Point NSW 2027 |
Darling Point | 2008 | Mr J & Mrs M Beville | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Jetty at No 6 Joly Parade Hunters Hill for St Joseph’s College | Hunters Hill | 2007 | Bellingham Marine (Aust) P/L | Maritime design, documentation, inspection during construction and certification upon completion | Maritime Analysis, Design & Report. | ||||||
| Blackwattle Bay Wharf - Stages 1 to 3 | Sydney, NSW | 2004 to current | Hanson Construction Materials Pty Ltd | Structural & maritime engineering design and documentation of wharf substructure remedial works - Stages 1 - 3. | Structural Design and documentation - Construction Inspection - Certification of works | ||||||
| 35 Brooklyn Road Tourist Development | Brooklyn, NSW | 2005 to 2007 | Gaofind Pty Ltd & Lorebray Pty Ltd | Civil engineering design and documentation. Concept design, Environmental Assessment, Planning Approvals, Submissions to Authorities | Civil Design & Documentation | ||||||
| Sylvania Marina - Marina Extension & Slipway - Pollution Control Systems | Sylvania, Sydney, NSW | 2006 | Marina Investments Pty Ltd | Maritime Design & Documentation, concept designs, Environmental Studies, Approvals, Authority Applications | Maritime Structures Design & Documentation | ||||||
| Sydney Fish Markets - Carpark & Boardwalk | Pyrmont, Sydney, NSW | 2006 | Sydney Fish Markets Pty Ltd | Civil Design & Documentation of Carpark Redevelopment, and Boardwalk Improvements | Civil Design & Documentation | ||||||
| Lubrizol International - Stage 2 | Silverwater, NSW | 2006 to 2009 | Lubrizol International Inc. | Structural Design and documentation. Authority approvals. Tender Documentation. Construction Inspections. | Structural design and documentation - site inspections. | ||||||
| Sydney International Boatshow Marine Certification | Sydney, NSW | 2006 | Boating Industry Association |
Maritime Analysis, Design, Inspection and Certification
|
Maritime Design and Certification | ||||||
| Manildra Jetty Refurbishment | Nowra, NSW | 2006 | Manildra Group | Design and Documentation | Maritime / Structural Design & Documentation | ||||||
Jetty, Ramp and Pontoon at 5 Reiby Road, Hunters Hill.
|
Sydney , NSW | 2006 - current | Ms Kyle & Mr Snaith | Maritime Design & Documentation, Approvals, Authority Applications | Maritime Structures Design Check & Documentation | ||||||
| Slipway Cradle for Brooklyn Marina | Brooklyn, NSW | 2006 | Brooklyn Marina | Design and Documentation | Maritime / Structural Design & Documentation | ||||||
Jetty, Ramp and Pontoon at 27 Wybalena Road, Hunters Hill.
|
Sydney , NSW | 2006 - current | Mr A J Demetriou | Maritime Design & Documentation, Approvals, Authority Applications | Maritime Structures Design Check & Documentation | ||||||
| Blackwattle Bay - Sea Wall | Sydney , NSW | 2006 - current | Hanson Construction Materials Pty Ltd | Investigation and Design to refurbish existing seawall | Maritime / Structural Design | ||||||
| Sylvania Marina - Marina Extension & Slipway - Pollution Control Systems | Sylvania, Sydney, NSW | 2006 | Marina Investments Pty Ltd | Maritime Design & Documentation, concept designs, Environmental Studies, Approvals, Authority Applications | Maritime Structures Design & Documentation | ||||||
| 35 Brooklyn Road Tourist Development | Brooklyn, NSW | 2005 - current | Gaofind Pty Ltd & Lorebray Pty Ltd | Civil engineering design and documentation. Concept design, Environmental Assessment, Planning Approvals, Submissions to Authorities | Civil Design & Documentation | ||||||
| Shell Gore Bay Pontoon | Annandale, NSW | 2005 | Landmark Marinas Pty Ltd Mr. R. Oppdeisano |
Maritime Design & Documentation, concept designs, Environmental Studies, Approvals, Authority Applications | Maritime Structures Design & Documentation | ||||||
| Empire Marinas | Drummoyne, NSW | 2005 | Five Dock Point Marina Brokerage Pty Ltd | Layout design for maritime structures. | Maritime Design of structures | ||||||
| Homebush Bay East | Sydney, NSW | 2005 | Architectus Sydney Pty. Ltd. | Preliminary proposal for Marina Design | Maritme Design | ||||||
| Design & Detailing - Ramp, Jetty & Pontoon at Gore Bay | Sydney NSW | 2005 | Shell Engineering Pty Ltd Mr. Lance Kazmer |
Civil engineering design and detailing of a ramp, jetty and pontoon system using analysis software and computer aided drawing programs. | Maritime Structures Design & Documentation | ||||||
| Port Kembla Water Police Facility-Assessment for proposed boat lift facility | Sydney NSW | 2005 | Transfield Services Pty Ltd. Mr. D. Saliba |
Engineering Design analysis of proposed boat lift facility including concept design and details | Maritime Structures Design & Documentation | ||||||
| Seawall Refurbishment for Shell Refining Aust. | Gore Bay, NSW | 2005 | Mr. Lance Kazmer | Civil engineering design and documentation of seawall design and refurbishment. | Maritime Design of structures | ||||||
| Proposed Seawall Restoration – Timber Jetty Refurbishment and Associated Waterfront Works at 104-106 Louisa Road, Birchgrove NSW 2041. |
Birchgrove NSW 2041 | 2004 | Mrs K Cawsey | Conditioin Survey, report and design / document remedial works. | Civil & Structural Design and Documentation. | ||||||
| Jetty, Ramp & Pontoon for 21 Wybalena Road, Hunters Hill. | Hunters Hill. NSW | 2004 | Mr. J. Poole - 21 Wybalena Road, Hunters Hill | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Structural Inspection, Design & certificate. | ||||||
| Haduso Pty Ltd - 31 Wunulla Road, Point Piper | Point Piper NSW | 2004 | R. & L. Marine - Richard Oppedisano | Design, Documentation of Floating Pontoons, Gangway, Jetty and Marine Piles. | Structural Inspection, Design & certificate. | ||||||
| Burnett River Bridge Pile Repairs | Bunderburg. QLD. | 2004 | Corroseal Coatings Pty Ltd | Design, Documentation, Supervision of Construction and Project Management | Design & Documentation / Site Inspection. | ||||||
| Condition Survey of Pontoons , Jetty and Walkways at Sydney Fish Markets | Pyrmont. NSW 2009. | 2004 | Mr Joe Rotondo, Engineering Manager | Conditioin Survey, report and design / document remedial works. | Condition Survey & Report | ||||||
| McMahon Point Seawall | McMahon Point. NSW | 2004 | MacLeod Consultants Pty Ltd Don MacLeod |
Structural Design of Foundation, and External works including Retaining walls etc. | Condition Survey, design & documentation. | ||||||
| Condition Survey - Wharf 6 Port Kembla | Port Kembla. NSW | 2004 | Cement Australia Pty Ltd Attn. Neil Casalis Logistics Manager |
Condition Survey & Structural Analysis and Report on Structural Adequacy and Load rating. | Condition Survey, design & documentation. | ||||||
| Matilda Cruises Berths | Darling Harbour. NSW | 2003 | Matilda Cruises Attn. Mr. Justin Gordard |
Concept marine design | Report | ||||||
| Replacement of Wharf 6 Facilities at Gore bay | Gore Bay, NSW | 2003 | Shell Refinery Mr. Denis Green Mr. Geoff Bennet |
Concept marine design | Design & documentation. |